Formulas Used

Building Permit Fee (sliding scale on valuation):

  • ≤ $25,000 → $25.00 flat minimum
  • $25,001 – $50,000 → $25 + $5.00 per $1,000 over $25,000
  • $50,001 – $100,000 → $150 + $4.00 per $1,000 over $50,000
  • $100,001 – $500,000 → $350 + $3.00 per $1,000 over $100,000
  • $500,001 – $1,000,000 → $1,550 + $2.50 per $1,000 over $500,000
  • > $1,000,000 → $2,800 + $2.00 per $1,000 over $1,000,000

Adjusted Building Fee = Base Fee × Occupancy Multiplier × Jurisdiction Multiplier × [1 + (Stories − 1) × 0.03]

Plan Review Fee = Adjusted Building Fee × 0.65

Electrical Fee = max($75, $75 + Sq Ft × $0.004) × Jurisdiction Multiplier

Plumbing Fee = max($60, $60 + Sq Ft × $0.003) × Jurisdiction Multiplier

Mechanical Fee = max($65, $65 + Sq Ft × $0.0035) × Jurisdiction Multiplier

Sprinkler Fee = $50 + ⌈Sq Ft ÷ 130⌉ × $0.12 (1 head per 130 sq ft)

State Surcharge = max($5, Adjusted Building Fee × 0.015)

Admin / Technology Fee = Adjusted Building Fee × 0.02

Total = Sum of all applicable fees above

Assumptions & References

  • Fee schedule modeled after the ICC Building Valuation Data sliding-scale structure widely adopted by Tennessee municipalities (International Code Council).
  • Plan review fee of 65% of the building permit fee aligns with Tennessee Department of Commerce & Insurance (TDCI) guidelines and common local ordinances.
  • State surcharge of 1.5% reflects the Tennessee State Fire Marshal / TDCI commercial building inspection surcharge.
  • Occupancy multipliers reflect relative complexity and inspection intensity per IBC Chapter 3 occupancy classifications.
  • Jurisdiction multipliers are representative estimates based on published fee schedules from Nashville Metro Codes, Memphis / Shelby County, Knox County, and Hamilton County building departments.
  • Multi-story surcharge of 3% per additional story reflects increased inspection and plan review complexity.
  • Sprinkler head density estimated at 1 head per 130 sq ft per NFPA 13 light-hazard occupancy standard.
  • Electrical, plumbing, and mechanical fees are estimates; actual fees are set by the Tennessee State Electrical Board, State Plumbing Board, and local mechanical codes.
  • This tool does not include impact fees, tap fees, zoning fees, fire department review fees, or ADA compliance review fees, which vary significantly by jurisdiction.
  • Always verify fees with your local building department before budgeting. References: Tennessee Code Annotated § 68-120, local municipal ordinances, ICC 2021 Building Code as adopted by Tennessee.